Scroll Top
WORKS IN PROCESS
Assembly of signaling system with interlocking in the diesel branches of lines Mitre and Sarmiento

After taking part in the bidding process, called by the Administracion Ferroviaria Sociedad del Estado (Railway Adminsitration State Society) (ADIF SE), BRt was granted this very important project which is still in the execution stage. It is about a very important work related to operative safety for diesel branches in Lines Mitre and Sarmiento. Specifically, works consist of engineering, provision, installation and start-up of signaling system with interlocking throughout tracks of branches Moreno-Mercedes (Line Sarmiento) and Victoria-Capilla del Señor and Villa Ballester –Zarate (both Line Mitre. Siemens, Induvia and Mela Constructions have been added as contractors for these works.